EPL-
INFORMATION FOR YOUR BUILDING SOUL
COPYRIGHT PROTECTED
EPL MODEL TO END HOMELESSNESS, IN CURRENT PROGRESSIVE CULTURE
2)
Phase 1
-Accept/Take willing donations
-Set up a meeting with the City Council
-Propose that a space/warehouse that the City owns, and is available be used as a:
Store front
Overnight safe haven
Meal donation disbursement center (where pre-prepared meals, can be consumed)
*Main store front/retail space is used as a safe ground housing, prior to occupation of real time house.
Phase 2
Use funds, which are collected into a safe, upon inception (cash or bitcoin or alternative currency system) to purchase reduced affordable land.
Build small modular homes on this Land.
Allow for water and electrical hook-ups to be present absent a structure.
Allow structure to be movable, and relocatable.
Give 3/8 to 1/2 to 5/8 land parcels depending on living real time needs IE farm, wild stock etc..
Phase 3
Repeat the process with another group, drive money with retail store allotted by the City.
Use the funds to purchase real land.
Use this Land for homeless or rather homeward bound plots.
The homeless building commission will employ all homeless people, much like a barn raising, in order that structures be built.
Each Person is thus trainable to learn building process, and become a part of next phase of land occupation.
COPYRIGHT PROTECTED
EPL MODEL TO END HOMELESSNESS, IN CURRENT PROGRESSIVE CULTURE
2)
Phase 1
-Accept/Take willing donations
-Set up a meeting with the City Council
-Propose that a space/warehouse that the City owns, and is available be used as a:
Store front
Overnight safe haven
Meal donation disbursement center (where pre-prepared meals, can be consumed)
*Main store front/retail space is used as a safe ground housing, prior to occupation of real time house.
Phase 2
Use funds, which are collected into a safe, upon inception (cash or bitcoin or alternative currency system) to purchase reduced affordable land.
Build small modular homes on this Land.
Allow for water and electrical hook-ups to be present absent a structure.
Allow structure to be movable, and relocatable.
Give 3/8 to 1/2 to 5/8 land parcels depending on living real time needs IE farm, wild stock etc..
Phase 3
Repeat the process with another group, drive money with retail store allotted by the City.
Use the funds to purchase real land.
Use this Land for homeless or rather homeward bound plots.
The homeless building commission will employ all homeless people, much like a barn raising, in order that structures be built.
Each Person is thus trainable to learn building process, and become a part of next phase of land occupation.